PRA RANCANG PABRIK ARANG AKTIF DARI BAMBU DENGAN SISTEM FAST PYROLISIS DENGAN KAPASITAS 5000 TON/TAHUN
Abstract
Keywords
Full Text:
PDFReferences
Anonymous. 1995. Arang aktif teknis. Standar Nasional Indonesia (SNI) 06-3730- 1995. Jakarta
Brown, G.G., 1961, “Unit Operation”, Jonh Wiley and Sons, Inc., New York.
Brownell, L.E., and Young, E.H., 1979. “Process Equipment Desaign”, Willey Easthern Limited, New Delhi.
Bruun, E. W. 2011. Application of Fast Pyrolysis Biochar to a Loamy soil. (http://www.risoe.dtu.dk/rispubl/.../ris-phd-78.pdf, [online] diakses 10 Mei 2014)
Deperindag Kabupaten Riau. 1999. Profil industri arang aktif di Indonesia. Direktorat Jenderal Industri Kecil, Departemen Perindustrian dan Perdagangan RI. Jakarta.
Geankoplis, C.I. 1993. Transport Processes and Unit operations. 3rd ed. Prentice-Hall, Inc: New Jersey.
Jurnal Reka Buana Volume 1 No 2, Maret 2016 - Agustus 2016
Hendra, D. dan G. Pari. 1999. Pembuatan arang aktif dari tandon kosong kelapa sawit. Buletin Penelitian Hasil Hutan. Bogor.
Mulia, A. 2007. Pemanfaatan Tandan Kosong dan Cangkang Kelapa Sawit Sebagai BriketArang.(http://repository.usu.ac.id/bitstream/123456789/4424/1/08E00057.pdf, [online] diakses 15 Maret 2014). Tesis Sekolah Pasca Sarjana Universitas Sumatra Utara 2007.
Perry, Robert H. 2006. Perry’s Chemical Engineering Handbook, 8th ed. McGraw-Hill Companies Inc: New York.
Turare, C. 2002. Biomass Gasification – Technology and Utilisation. Artes Institute Glusburg (Germany). (http://www.pssurvival.com/PS/Biogas/. [online] diakses 17 Mei 2014).
Refbacks
- There are currently no refbacks.